Producing, installing , and up and running of 143 wind turbines of 660,550, and 300 Kilo Watt with 90 MW capacity in MAnjil, Harzvil, Siahpoosh, Isfahan, Shiraz, Zabol, Tabriz,& Mahshahr
Producing, installing , and up and running of 43 wind turbines of 660 Kilo Watt with the total capacity of 28.4 MW
Producing, installing , and up and running of 4 wind turbines of 660 Kilo Watt with the total capacity of 2.64 MW in Armenia
Producing, installing , and up and running of 2 wind turbines of 710 Kilo Watt with the total capacity of 1.42 MW in Khowaf site, Phase 1
Producing, installing , and up and running of 139 wind turbines of 710 Kilo Watt with the total capacity of 99 MW in Khowaf site, Phase 2